Commencement time:1995-5-1
Completion time:2000-9-30
Introduction:The diaphragm wall of the project is 32m high, including 44 × 5m slot sections. The diameter of the diaphragm wall is 68m, and the wall is 1.0m thick.
聯(lián)系方式
地址:Airport Construction Engineering Co.,Ltd
電話:022-66708712
傳真:022-66708713